Client wanted a compact and movable boiler room, so a 40ft steel container was required, set to specific dimension`s and an accurate layout. All pipework, motors & pumps inclusive of valve fitting had to be in the appropriate locations, exhaust flues where also installed along with pre fabricated inserts to be welded in place.

 
 
 